You pay for your ticket in your ski pass at the ticket office under Resort restaurant RPK 3, originally Nick Wilson's Cafe. Many also eat at Corbet's Cabin, which serves World Famous waffles. In winter, skiers take the tram to the top of the mountain where they are able to ski Rendezvous Mountain as well as out of bounds locations. ![]() There were fireworks and music as someone dressed as Santa zipped down from the car. The crowd cheered as the wrap covering it dropped. The tram slowly made its way down the cables towards the new lower terminal when it stopped over the crowd. 20,000 people came to show their support that night. The launch of the new tram happened on December 19, 2008. The original $20 million they thought it was going to take to make the new tram later became $31 million which was completely funded by the resort. Construction was completed on time in December 2008. From there, all the components traveled on train or road to Jackson Hole, Wy. In March 2008 the company shipped everything to Houston, Texas in 50 sea containers. The Austrian company Doppelmayr Garaventa created the five steel towers, terminals and mechanics. One of the many problems was that the almost 41 year old cables were starting to unwind and unravel.ĭesigns for the new tram were released and approved in early 2007 with demolition and construction beginning in April of that year, the day after the resort closed for the 2006-2007 ski season. An inspection revealed that the tram would last for a couple more years, but the family thought it best to decommission it before any safety hazards raised. $1 million of a $1.6 million grant came from a government program called Area Redevelopment Administration which proposed to loan funds to seasonally depressed communities.Īfter 40 years of service, the Kemmerer family (the owners of the resort) decided to retire the tram in September 2005. Two thirds of the money for construction in the 1960s came from the federal government. still to this day, the trams slows down in the summer for sight seeing. It carried 62 skiers and 1 conductor in winter and 45 passengers and 1 conductor in summer to the top in 12 minutes minutes. Just like the current tram, it has 5 Cable towers with tower 1 being the tallest at 65 Meters or 196 ft. ![]() The original tram took a total of 26 months to build, from May 1964-July 1966. The original tram carried 62 skiers and 1 conductor, and took 10.5 minutes At 4,000 feet in elevation gain, it is the longest ski lift in North America. The current tram holds 100 skiers and 1 operator in the winter. The first tram started operation on July 31, 1966, while the second tram started operation on December 20, 2008. The tram takes people to the top of Rendezvous Mountain, at a summit of 3,185 meters (10,450 feet). ![]() The Jackson Hole Aerial Tram (also known as the Musical Tram) is an aerial tramway located at Jackson Hole Mountain Resort in Jackson Hole, Wyoming, and has become an iconic symbol of the Valley.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |